As of December 14 stops at any rail station at least once every half hour a train. On most lines was already so, but in the new timetable, which starts this Sunday, which now applies to all frequency lines of the Dutch Railways. This is the minimum standard that entered the NS
.
The introduction means that the last four tracks of the train every half hour a train arrives and departs. It involves Arnhem-Ede / Wageningen, Breda-Dordrecht, Roosendaal-Dordrecht-Sittard and Heerlen.
The railways also will better serve the party crowd. Trains run from now on Fridays and Saturdays until 1 o’clock at night. It’s about connections of busy intersections in the Randstad to surrounding cities such as Zwolle, Deventer and Arnhem.
Other changes in the new timetable every night trains to and from Schiphol, more intercity between Amersfoort, Apeldoorn Deventer and sixteen trains per day between Amsterdam and Brussels
.
class=”clear”
No comments:
Post a Comment