For traffic from Utrecht to Breda drive, remains only one of the two lanes available.
Rijkswaterstaat does not know the precise time at which the two lanes to the north will open up. “We start around five o’clock in the morning of conversion. In any case, there are for the striker two strips available in the direction of Utrecht.”
Since last week Tuesday is the Merwedebrug for goods vehicles and buses in both directions closed because of hairline cracks in the supporting structure have been discovered. The last day was for the other traffic in both directions, only one lane is open, because the other strip was used for the control of traffic. Thus arose the regular long traffic jams.
The ANWB and the VID expect that by the provision of two lanes in a northerly direction Thursday morning less congestion. In particular, in the direction in the rush hour traffic.
Cargo traffic on the A27 in the direction Utrecht driving, with a portal pointed out that they do not have the Merwedebrug allowed to drive and get to the exit Nieuwendijk sent. Truck drivers that are still driving, stumbling for the exit Werkendam on the police.
No comments:
Post a Comment