Saturday, September 27, 2014

Two bombs culled in floodplains – Focus on News

Two bombs culled in floodplains – Focus on News

The work proceeded smoothly. At 10.30 the last bomb could be secured. The main road along the river has been released again, cyclists and pedestrians can pass the cull place again. Over the railway bridge and the shipping, rail and air traffic again

It bombs are cleared to work for the project to perform. Room for the River They were discovered during research prior to this work. The bombs are removed at a later date detonated at a designated location.

Room for the River
Rivers increasingly have to deal with high water levels. They get more rain and melt water to process while there is very little space between the dikes. This increases the risk of flooding.

Only dike increase is insufficient to reverse.
The increasing risk of flooding, the water level in the rivers should be reduced. Therefore gives Rijkswaterstaat with water boards, municipalities and counties our rivers at more than thirty locations more space. For example, by pushing dikes, digging side channels and deepen floodplain.

The water board Groot Salland and Valley Veluwe and ensure that the IJssel in Deventer given more space. There will be large-scale excavations of the floodplain place. With the construction of six secondary channels over a total length of ten kilometers, the bottleneck in the IJssel in Deventer -. Bottle neck at the height of the historic townfront resolved

LikeTweet

No comments:

Post a Comment